Purpose
Lessons Learned and Benchmarking is the structured process of capturing what went well, what went wrong, and why on a completed project, and translating those insights into actionable improvements for future projects and estimates. For RICS-regulated QS firms, lessons learned are both a professional obligation (RICS Lessons Learned, 1st ed., April 2016) and a commercial imperative — firms that learn systematically from each project produce more accurate estimates, avoid repeated mistakes, and deliver better client outcomes.
Benchmarking is the analytical counterpart to lessons learned: using the project's final cost data — structured in BCIS/SFCA elemental format and compared with BCIS industry data — to assess whether the project's cost performance was typical, above, or below average for its type. Benchmarking identifies whether cost overruns were project-specific (and avoidable) or sector-wide (and foreseeable).
Both activities should be completed while the project is fresh — ideally within 3 months of the Final Account Agreement. Once key project personnel have moved on and institutional memory has faded, the quality of lessons learned diminishes significantly.
Key Principles
- RICS, Lessons Learned (1st ed., April 2016): identifies the common causes of project failure (lack of clear objectives, poor planning, poor cost management, inadequate procurement, lack of leadership) and provides a structured framework for capturing and applying lessons learned.
- RICS Cost Analysis and Benchmarking (2nd ed., August 2024): BCIS elemental format is the standard for cost benchmarking; cost/m² GIFA should be compared against BCIS upper quartile, mean, and lower quartile for the project type; significant variances from the mean require explanation.
- RICS Lessons Learned (1st ed., 2016): lessons should be captured under structured headings — design, procurement, programme, cost, contract, team — to ensure consistency across projects and enable aggregation into firm-level lessons.
- BCIS submission: RICS Cost Analysis and Benchmarking (2nd ed.) requires firms to submit completed project cost data to BCIS; the benchmarking database is only as accurate as the data contributed to it — non-submission degrades the quality of the whole profession's estimating capability.
- Knowledge management: lessons learned documents should be accessible to the whole QS firm, not filed away in an individual project folder; firms should have a knowledge management system that makes project lessons available to those preparing future estimates.
Practical Application
Common Mistakes to Avoid
- Holding the lessons learned review too late — once project personnel have moved on, the quality of the lessons is severely reduced; the workshop must happen while memories are fresh.
- Making the lessons learned a tick-box exercise that is not read or used — if the outputs are not accessible to the firm and not used to improve future estimates, the exercise has no value.
- Failing to submit BCIS cost analysis data — this is both a professional obligation and a contribution to the profession's collective knowledge; firms that do not submit are effectively free-riding on data submitted by others.
- Benchmarking against the wrong project type — a bespoke office fit-out cannot be benchmarked against a standard new-build office; the QS must select the correct BCIS project category for meaningful comparison.
- Lessons learned that blame individuals rather than systems — the most useful lessons identify systemic failures (e.g. design was not complete at tender because the programme did not allow enough time) rather than attributing blame to individuals.
APC Competency & Quick Reference
- Project Financial Control and Reporting Level 3 — lessons learned, benchmarking, BCIS analysis
- Quantity Surveying & Construction Level 3 — BCIS elemental analysis, cost/m² benchmarking
Completion & Final Account Checklist
CPD Learning Outcomes
- Facilitate a structured lessons learned workshop using the RICS Lessons Learned (1st ed., April 2016) framework and produce a Lessons Learned Register that captures systemic insights for the firm's future projects.
- Prepare a BCIS/SFCA elemental cost analysis, benchmark the project's cost/m² against BCIS data for the project type, and submit the completed data to BCIS in compliance with RICS Cost Analysis and Benchmarking (2nd ed., August 2024).
- Apply lessons learned from project benchmarking outliers to update the firm's standard estimating rates and improve the accuracy of future cost plans.
Further Reading
- RICS, Lessons Learned, 1st edition, April 2016
- RICS, Cost Analysis and Benchmarking, 2nd edition, August 2024
- RICS, Project Financial Control and Reporting (Black Book)
- BCIS Standard Form of Cost Analysis (SFCA) and online submission portal — bcis.co.uk
- RICS, NRM 1: Order of Cost Estimating and Cost Planning for Capital Building Works, 3rd edition, October 2021 — elemental structure
- RICS Rules of Conduct 2021 — honesty, integrity, and competence obligations